Infrastructure consulting

Data centres designed to run for decades.

Strategic consulting for data centre planning, design, construction and optimisation, from greenfield builds to modernisation.

  • Facility design
  • Capacity planning
  • Power and cooling
  • Tier certification
Data Centre Consulting50+ DC projects
What we design to

The numbers that decide cost and uptime.

PUE measures how much of your power reaches the IT equipment rather than cooling and overhead. Modern facilities target 1.2 to 1.5, and a lower figure means a lower electricity bill for the life of the site. Tier level sets redundancy — Tier III suits most enterprises, Tier IV where downtime cannot be tolerated at all.

50 kW to multi-MWFacility range
50+Data centre projects
1.2-1.5Target PUE
Tier II-IVDesign experience
Design services

Every layer of the facility.

Facility planning and design

Site selection, raised floor, hot and cold aisle containment, power, cooling and fire suppression for Tier I to IV.

Capacity planning

Power, cooling and space modelled for 3 to 5 years of growth.

Technology architecture

Server, storage and network design: converged, hyper-converged or three-tier.

Power and cooling optimisation

N+1 or 2N power with UPS and generators, efficient cooling for a PUE of 1.2 to 1.5.

Security and compliance

Fencing, biometrics, CCTV and mantraps to ISO 27001, PCI DSS or government standards.

Energy and sustainability

Renewables, heat recovery, LEED planning and carbon reduction.

Modern approaches

Beyond the traditional build.

Hybrid cloud integration

Direct Connect, ExpressRoute and Interconnect to public cloud.

Edge data centres

Micro sites of 10 to 50 kW for retail, branches and IoT.

Software-defined infrastructure

VMware, OpenStack or Kubernetes with infrastructure-as-code.

Modular and prefab

Containerised modules cut build time from 18-24 months to 6-12.

Operational planning

Making sure it runs well.

Staffing and skills

NOC, facilities and engineering teams sized for 24/7 operations.

Process design

ITIL-aligned SOPs for maintenance, incidents, change and capacity.

Monitoring systems

DCIM plus Nagios, Zabbix or SolarWinds for real-time visibility.

Maintenance and lifecycle

Preventive schedules and refresh cycles for servers, storage and network.

Business continuity

Runbooks for power, cooling and network failures, with DR testing.

Cost optimisation

Power, cooling and space efficiency, consolidation, colo vs owned.

Questions we hear often

Which data centre tier do I need?

Tier I is 99.671% uptime with no redundancy, Tier II 99.741%, Tier III 99.982% with concurrent maintainability, Tier IV 99.995% with fault tolerance. Most enterprises choose Tier III.

How long does a build take?

Greenfield: 18 to 24 months. Modular: 6 to 12 months. Retrofit: 6 to 9 months. Planning and design alone can take 3 to 6 months.

What is PUE?

Power Usage Effectiveness: total facility power divided by IT power. Modern sites target 1.2 to 1.5. Lower PUE means lower electricity bills.

Build, colocate or cloud?

Build for 1+ MW long-term needs, colocation for 50-500 kW standard needs, cloud for variable workloads. We model TCO for each option.

Talk to us about Data Centre Consulting

We usually reply within one business day. Already on AWS, Azure or GCP? Share your bill and we will send a side-by-side INR comparison.