Managed services · Migration

Move to the cloud without the drama.

Technology moves that minimise risk and keep your business running, from a single app to a full data centre.

  • Discovery and planning
  • Tested before cut-over
  • Rollback plans
  • Post-migration support
Migration ServicesPhased, with rollback
Our process

Five phases, no surprises.

Discovery and assessment

Inventory systems, apps and data, map dependencies, identify risks and estimate effort. Usually 1 to 2 weeks.

Migration planning

A detailed plan with timeline, resources, rollback steps and communication. Cut-overs scheduled for low-traffic windows.

Pre-migration testing

Test environment, sample workloads moved, function and performance validated. Usually 1 to 3 weeks.

Production migration

Executed to plan, non-critical systems first, critical last, with live monitoring during cut-over.

Validation and optimisation

Everything verified, no data loss, 2 to 4 weeks of monitoring, and tuning based on real usage.

Post-migration support

24/7 support through the transition, usually 30 to 90 days, then documentation handover.

Key benefits

End-to-end migration support.

Migration planning

Assessment, timeline, resources and risk mitigation.

Application analysis

Dependencies and compatibility checked before anything moves.

Secure data transfer

Databases, files and configs moved with encryption and integrity checks.

Testing and validation

Function, performance and data accuracy verified before go-live.

Rollback procedures

Documented fallback plans and backups if a cut-over goes wrong.

Post-migration support

Monitoring, troubleshooting and tuning after go-live.

What we move

Every kind of migration.

  • Cloud migrations. On-prem to cloud, or between AWS, Azure, GCP and Host4India.
  • Data centre relocations. Physical moves with coordinated shutdown and start-up.
  • Platform upgrades. OS, middleware or application upgrades with compatibility testing.
  • Database migrations. SQL Server, Oracle, PostgreSQL or MongoDB, with data validation.
  • Legacy modernisation. Old platforms moved to modern infrastructure.
  • M&A IT integration. Identity, applications and data consolidated after a merger.
Strategies

How we reduce migration risk.

Phased migration

Workloads move in stages, tested between each one.

Pre-production testing

Apps and data proven in the new environment before cut-over.

Migration support

Our team on hand through planning, execution and after.

Rollback plans

A documented way back if something critical fails.

Business continuity

Low-traffic windows and parallel systems keep you running.

Questions we hear often

What types of migration do you handle?

Cloud migrations (AWS, Azure, GCP), data centre relocations, database migrations (SQL Server, Oracle, PostgreSQL, MongoDB), application upgrades, legacy modernisation and M&A integrations.

How long does a migration take?

Small apps (1 to 5 VMs): 1 to 2 weeks. Medium (50 to 100 VMs): 6 to 10 weeks. Large (500+ VMs): 4 to 6 months. Databases: 1 to 4 weeks. You get a detailed timeline during planning.

How do you minimise downtime?

Non-critical systems move first, cut-overs run in low-traffic windows, parallel systems stay up during transition, replication shortens the cut-over and rollback is always ready.

How is data kept secure?

Encryption in transit (TLS 1.2+), checksum and hash verification, backups throughout, documented chain of custody and secure links such as VPN, Direct Connect or ExpressRoute.

Talk to us about Migration Services

We usually reply within one business day. Already on AWS, Azure or GCP? Share your bill and we will send a side-by-side INR comparison.