Move to the cloud without the drama.
Technology moves that minimise risk and keep your business running, from a single app to a full data centre.
- Discovery and planning
- Tested before cut-over
- Rollback plans
- Post-migration support
Phased, with rollbackFive phases, no surprises.
Discovery and assessment
Inventory systems, apps and data, map dependencies, identify risks and estimate effort. Usually 1 to 2 weeks.
Migration planning
A detailed plan with timeline, resources, rollback steps and communication. Cut-overs scheduled for low-traffic windows.
Pre-migration testing
Test environment, sample workloads moved, function and performance validated. Usually 1 to 3 weeks.
Production migration
Executed to plan, non-critical systems first, critical last, with live monitoring during cut-over.
Validation and optimisation
Everything verified, no data loss, 2 to 4 weeks of monitoring, and tuning based on real usage.
Post-migration support
24/7 support through the transition, usually 30 to 90 days, then documentation handover.
End-to-end migration support.
Migration planning
Assessment, timeline, resources and risk mitigation.
Application analysis
Dependencies and compatibility checked before anything moves.
Secure data transfer
Databases, files and configs moved with encryption and integrity checks.
Testing and validation
Function, performance and data accuracy verified before go-live.
Rollback procedures
Documented fallback plans and backups if a cut-over goes wrong.
Post-migration support
Monitoring, troubleshooting and tuning after go-live.

Every kind of migration.
- Cloud migrations. On-prem to cloud, or between AWS, Azure, GCP and Host4India.
- Data centre relocations. Physical moves with coordinated shutdown and start-up.
- Platform upgrades. OS, middleware or application upgrades with compatibility testing.
- Database migrations. SQL Server, Oracle, PostgreSQL or MongoDB, with data validation.
- Legacy modernisation. Old platforms moved to modern infrastructure.
- M&A IT integration. Identity, applications and data consolidated after a merger.
How we reduce migration risk.
Phased migration
Workloads move in stages, tested between each one.
Pre-production testing
Apps and data proven in the new environment before cut-over.
Migration support
Our team on hand through planning, execution and after.
Rollback plans
A documented way back if something critical fails.
Business continuity
Low-traffic windows and parallel systems keep you running.
Questions we hear often
What types of migration do you handle?
Cloud migrations (AWS, Azure, GCP), data centre relocations, database migrations (SQL Server, Oracle, PostgreSQL, MongoDB), application upgrades, legacy modernisation and M&A integrations.
How long does a migration take?
Small apps (1 to 5 VMs): 1 to 2 weeks. Medium (50 to 100 VMs): 6 to 10 weeks. Large (500+ VMs): 4 to 6 months. Databases: 1 to 4 weeks. You get a detailed timeline during planning.
How do you minimise downtime?
Non-critical systems move first, cut-overs run in low-traffic windows, parallel systems stay up during transition, replication shortens the cut-over and rollback is always ready.
How is data kept secure?
Encryption in transit (TLS 1.2+), checksum and hash verification, backups throughout, documented chain of custody and secure links such as VPN, Direct Connect or ExpressRoute.
Talk to us about Migration Services
We usually reply within one business day. Already on AWS, Azure or GCP? Share your bill and we will send a side-by-side INR comparison.